SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement

Product Details
Customization: Available
After-sales Service: Remote Help
Warranty: 1 Year
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
  • SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • FAQ
Overview

Basic Info.

Model NO.
LQR-130C
Power Source
Diesel
Certification
EPA, CS, CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition
New
Max Drilling Depth
10m
Max Drilling Diameter
800mm
Max Output Torque
130kN.M
Total Weight
31
Rotate Speed
3-45 R/Min
Diamension (mm)
11500*3000*3550mm
Engine
Cumminss
Engine Rated Power
154kw
Track Shoe Width
600mm
Travelling Speed (Km/H)
5km/H
Color
Customer′s Requirement
Trademark
SDLQ
Origin
China
HS Code
8430419000
Production Capacity
30 Sets

Product Description

Product Description

Introduction to the CFA Drilling Rig

The CFA drilling rig, also known as the "Continuous Flight Auger (CFA) Drilling Rig," is an exceptionally efficient machine purpose-built for pile foundation construction. The innovation lies in its core process, which harmoniously combines both drilling and concrete pouring into one fluid operation. This method ensures the completion of the entire pile construction in a single, streamlined pass. As a result, the construction process witnesses a dramatic enhancement in efficiency, while simultaneously keeping noise and vibration to a minimum. This not only accelerates project timelines but also ensures minimal disruption to the surrounding environment.

Key Features:

  • Integrated Construction Process:
    The CFA drilling rig employs a continuous flight auger that drills into the earth while effectively removing the excavated soil through the auger's spirals. Upon reaching the designated depth, concrete is continuously funneled through the hollow drill rod, creating a flawless pile. This well-orchestrated method is designed to conserve both time and labor, making it an economical choice for construction projects.

  • Low Noise and Low Vibration:
    In comparison to conventional pile driving and rotary drilling rigs, the CFA drilling rig distinguishes itself by producing significantly lower levels of noise and vibration. This feature ensures it is ideally suited for urban landscapes and other areas where noise sensitivity is a priority.

  • Precise Quality Control:
    State-of-the-art CFA drilling rigs come equipped with cutting-edge monitoring systems that deliver real-time information on drilling depth, concrete flow, and pressure. This technological sophistication guarantees that each pile constructed strictly adheres to the requisite design specifications.

  • Strong Adaptability:
    Whether confronted with soft soil conditions or moderately compact layers, the CFA drilling rig excels in performance. Its adaptable construction method allows it to be ideally suited for a wide range of engineering endeavors.

Product Parameters
order number
 
unit
LQR-130C
1
Maximum drilling diameter
mm
300-800
2
Maximum drilling depth
m
10
3
Safe drilling operation range (from the rotary center)
mm
3500
4
Drilling rig size under working condition (length * width * height)
mm
6700*4000*13500
5
Drilling rig size in transportation state (length * width * height)
mm
11500*3000*3550
6
Operating weight (including drilling tool under standard configuration)
t
31
 
 
 
Motor
Brand
.
Cummins
7
Engine model
/
QSB7
Engine rated power/speed
kW
154
Emission stage
/
3Stages
8
Hydraulic system
Maximum working pressure of main pump
MPa
30
9
Power head
Rated output torque
kN·m
130
Operating speed
r/min
8-48
10
 
Feed cylinder
Maximum pressurization
kN
120
Maximum lifting force
kN
120
Pressurization stroke
mm
2500
11
 
 
Main winch
Main winch lifting force
kN
130
Maximum single rope speed of main winch
m/min
60
Diameter of main winch wire rope
mm
24
12
 
 
Auxiliary winch
Auxiliary winch lifting force
kN
30
Maximum single rope speed of auxiliary winch
m/min
55
Diameter of auxiliary winch wire rope
mm
12
13
 
Drill mast
Left/right inclination of mast
°
±4
Mast rake
°
±4
14
Turntable rotation
Turntable rotation angle
°
360
15
 
Speed
Maximum traveling speed of the whole machine
km/h
5
Maximum gradient of the whole machine
%
30
16
 
chassis
track width
mm
600
Total track width
mm
Telescopic chassis (3000-4000)
Wheel distance
mm
4600
17
Drill pipe specification
360Machine lock

Machine Photos

SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel ReinforcementSDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement

Exhibition
 
Our unwavering commitment surpasses mere sales; we enthusiastically participate in an array of international exhibitions. This dedication not only amplifies the visibility of our rigs but also facilitates continual learning and global networking. Proudly, we present our hallmark: 'Rotary Drilling Rig, Made in China!'
 
SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement

Customer photo
 
We warmly invite our global clientele to explore our state-of-the-art factory. Enjoy complimentary accommodation along with live, operational demonstrations that highlight our technical prowess. Your satisfaction is our highest priority and the greatest testament to our success.
SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
Working photo
 
With deep gratitude for your invaluable feedback, we take pride in being exporters to 50 countries around the globe. Our key advantage is being a direct manufacturer of rotary drilling rigs, allowing us to bypass middleman costs and offer you competitive, direct pricing!
SDLQ CFA Smart Monitoring Rig / Real-Time Data Transmission / Urban Utility Tunnel Reinforcement
FAQ
1.Q: Are you a manufacturer?
 A: Yes, we are a professional rotary drilling rig  manufacturer.
2.Q: What does your company produce?
 A: The main products of our company include rotary drilling rig.
3.Q: How about your delivery time?
 A: Normally the delivery time is about 7-15 days. For some specialcase, we can make it within 2 weeks, it depends on different products.
4.Q: What methods of payment do you accept?
A: We accept T/T, L/C.
5.Q: Do you offer any deals or discounts?
 A: Yes, price depends on different quantity, different quantity will give you different price


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed